Reconstruction, renovation, and expansion of the Festo Production manufacturing complex. The production facility is situated on a 36,836 sq m site, located at 7 Hristofor Kolumb Blvd. and Tsvetan Lazarov Blvd., in the Karо Industrial Zone.The project includes the renovation of Workshop 1 on the ground floor of Building 1, along with an extension designed to provide the required area for the production of assembled printed circuit boards (PCBs).Within Building 1, the existing production lines will be dismantled to allow for the development of a new office area and the reconfiguration of existing premises.In Building 3, a new materials warehouse will be constructed, while the existing washing facilities and battery charging rooms will be renovated and reorganized.





